Get a Quote

Canton of Geneva · 2026 guide · verified on 30 September 2026

Energy subsidies in the canton of Geneva in 2026

From 1 February 2026 Geneva applies a new GEnergie subsidy scale backed by CHF 80 million. Solar remains federal (Pronovo), topped up by the premiums of the utility SIG. Here are the verified amounts and the right timing for each application.

What the GEnergie 2026 scale pays in Geneva1

Thermal insulation, U ≤ 0.20 W/m²K after works — measure M-01

CHF140/m²

Air-to-water heat pump (M-05) — base, + CHF 400 per kW

CHF3'000

Geothermal heat pump (M-06) — base, + CHF 800 per kW

CHF3'000

Which subsidy for your project?

Black solar panels installed by Abelarti on a tiled roof

Solar panels

No cantonal aid: the federal Pronovo one-time grant, after commissioning. In Geneva the SIG solar premium adds 25% of the grant below 30 kWp.

Am I eligible? →
LG THERMA V R290 Monobloc — pompe à chaleur air-eau

Heat pump

CHF 3'000 + 400/kW air-to-water, CHF 3'000 + 800/kW geothermal — only when replacing an oil, gas or electric heating system.

Am I eligible? →
Panneaux isolants swisspor en entrepôt, prêts pour la livraison

Thermal insulation

CHF 140/m² of insulated element (facade, roof, walls, floor) for buildings with a permit issued before 2000 — and aid based on the whole heated area for a global renovation.

Am I eligible? →

Solar: Pronovo, topped up by SIG premiums

The cantonal GEnergie 2026 scale contains no solar measure: the base support remains the federal one-time grant from Pronovo, applied for after commissioning for installations below 100 kWp.

  • SIG solar premium2: 25% of the federal grant for new installations from 2 to under 30 kWp, commissioned and certified by Pronovo after 1 January 2026 (15% from 30 to 100 kWp) — a premium from the utility SIG, not a cantonal subsidy.
  • SIG battery premium: CHF 130 per kWh, capped at the first 15 kWh, for a battery under 50 kWh coupled to a solar installation — cumulative with the solar premium.

We size the installation, file the Pronovo application at the right moment and price the SIG premiums into the quote. Discover our solar offer.

See also: our solar panel installation page — Geneva →

Single-family home fitted with solar panels by Abelarti in western Switzerland

Abelarti residential installation in western Switzerland.

Heat pump: CHF 3'000 base plus power

The GEnergie 2026 scale supports replacing an oil, natural-gas or fixed electric heating system1:

  • Air-to-water (M-05): CHF 3'000 + CHF 400 per kW — example for 10 kW: CHF 7'000 by formula. CHF 1'000 bonus for a certified heat meter.
  • Geothermal or water-source (M-06): CHF 3'000 + CHF 800 per kW, same meter bonus.

Key conditions: heat-pump system module required below 15 kW, subsidised power capped at 50 W/m², building outside the structuring district-heating zones (or with a derogation), subsidy limited to 50% of costs. The application must reach the OCEN at least 14 days before works start.

See our R290 air-to-water heat pumps.

LG THERMA V R290 Monobloc — unité extérieure

LG THERMA V R290 Monobloc — official LG visual. M-05/M-06 amounts are power-based formulas, not flat grants.

Insulation: CHF 140/m² per insulated element

Geneva's measure M-01 pays1:

Facade, roof, walls and floor — U < 0.20 W/m²K after worksCHF 140/m²
Buried walls and floors deeper than 2 m — U < 0.25 W/m²KCHF 80/m²
Bonus for integrated solar collectors on a protected building+ CHF 40/m²

Conditions: building permit before 2000, U-value improved by at least 0.07 W/m²K, CECB Plus required from CHF 10'000 of aid, not cumulative with measures M-10 to M-13. Discover our insulation solutions.

Isolants swisspor en entrepôt avec camion de livraison

swisspor insulation — official swisspor visual. At CHF 140/m², 100 insulated m² represent a CHF 14'000 reference value.

Global renovation: aid based on the whole heated area

Beyond single measures, the GEnergie 2026 scale supports the global renovation of a building — envelope and building services together. Amounts are calculated per m² of energy reference area (ERA, SRE in French), i.e. the heated floor area1:

Single-family home — HPE renovation standard (M-11 MoPEC, M-12 Minergie®, M-13 CECB® C/B), per m² ERACHF 390
Single-family home — THPE renovation standard (M-11 MoPEC, M-12 Minergie®-P, M-13 CECB® B/A), per m² ERACHF 470
Apartment building — HPE / THPE renovation, per m² ERACHF 210 / 270
Single-family home — CECB® rating improved by 2 / 3 / 4+ classes (M-10), per m² ERACHF 150 / 230 / 390
Apartment building — same CECB® improvement (M-10), per m² ERACHF 90 / 140 / 210

Conditions: building permit in force on 1 January 2000 at the latest; an HPE-Réno or THPE-Réno building permit (M-11 to M-13), or a CECB® certificate and CECB® Plus report (M-10), required for the decision; not cumulative with the single measures M-01 to M-09. The general rules still apply: application received by the OCEN at least 14 days before works, subsidy in principle limited to 50% of costs.

Step by step too: an owner who renovates in several stages (measures M-01 to M-09) and finally reaches an HPE or THPE standard can claim the M-15 bonus, which tops up the subsidies already received to the corresponding HPE or THPE amount. It is filed together with the application for the last stage.

Formula example: a 180 m² ERA single-family home renovated to the THPE standard → 180 × CHF 470 = CHF 84'600, within the limit of 50% of the works cost.

Before replacing a boiler, it therefore pays to look at the building as a whole — envelope, heating and solar — to choose the target standard and the order of works. We help you identify the applicable measures: insulation · heat pump · solar.

IDC: thresholds tighten from 2027

The heat consumption index (IDC) measures a building's energy use for heating and hot water per m². Geneva's energy regulation sets these obligations3:

  • IDC from 125 to 222 kWh/m²·yr: energy audit and optimisation measures.
  • IDC above 222 kWh/m²·yr: energy renovation mandatory.
  • From 2027: mandatory renovation threshold lowered to 180 kWh/m²·yr.
  • From 2031: threshold lowered to 153 kWh/m²·yr.

Houses and small buildings (fewer than 5 heat consumers) are also covered: their owners must assess the building's IDC, with a compliance timetable specific to this category.

HPE / THPE: tax and financing

A building renovated to the HPE or THPE standard can be exempted from the supplementary property tax (impôt immobilier complémentaire) for 20 years, with a certificate of conformity from the OCEN, if the building permit application was filed after 5 August 2010. The certificate has been subject to a fee since 1 September 2026 (CHF 200 online)4.

On top of subsidies, the canton provides a state loan guarantee and, when bank financing is not available, a cantonal loan (10 years maximum). The regulation adopted in July 2026 adds increased subsidies when the owner's financial capacity is insufficient — useful in particular for condominiums (PPE). Assessed case by case5.

Batterie de stockage Sigenergy installée par Abelarti à Mont-sur-Rolle, canton de Vaud

Sigenergy battery — Abelarti installation in Mont-sur-Rolle (VD).

Your subsidy application in 4 steps

Eligibility and estimate

We identify the applicable federal, cantonal and municipal subsidies — clearly separating confirmed amounts from estimates.

Technical visit

A technician checks the building, power sizing, surfaces and the documents your application needs.

Filing at the right moment

Before works for cantonal measures, after commissioning for the Pronovo one-time federal grant.

Follow-up until payout

Invoices, certificates, completion notice: we follow the file until the money is actually paid.

Two extras worth remembering

Municipal subsidies

Several municipalities in the canton — including Genève, Carouge, Lancy, Meyrin — grant additional energy or renovation aid. Amounts, deadlines and budgets vary: get written confirmation from the municipality before counting this aid in your financing. We check your municipality before the quote.

Tax deductions

Energy-saving works are generally tax-deductible for private owners — but only the share you actually pay after subsidies counts. Confirm the details with the cantonal tax administration; we provide the supporting documents.

Abelarti in the canton of Geneva

From Bussigny, our teams cover the whole canton of Geneva — both banks of the lake. We know the Geneva specifics: the GEnergie scale, SIG premiums and OCEN requirements are part of every quote we produce.

Are your works eligible for the 2026 subsidies?

We identify the schemes that apply at your address, quantify the aid in your quote and file each application at the right moment.

Check my eligibility

Geneva subsidies 2026: the essential answers

Does Geneva subsidise solar panels directly?

No — the 2026 cantonal scale contains no solar measure. The base support is the federal Pronovo one-time grant, plus the solar premium of the utility SIG: 25% of the grant for installations below 30 kWp.

Should the application be filed before or after the works?

For the GEnergie scale, the application must be received by the OCEN at least 14 days before works start; works must then be completed within 24 months. For solar, the Pronovo application is filed after commissioning.

Is a storage battery subsidised in Geneva?

Not by the canton. SIG however pays a battery premium of CHF 130 per kWh, capped at the first 15 kWh, for a battery under 50 kWh coupled to a solar installation — cumulative with the SIG solar premium. See our storage solutions.

Is a heat pump in a new build subsidised?

No. Measures M-05 and M-06 only apply to replacing an existing oil, natural-gas or fixed electric heating system. Replacing an old heat pump with a new one is not subsidised either.

Is there a cap on Geneva subsidies?

Yes: the subsidy in principle does not exceed 50% of the works cost, with a minimum of CHF 1'000 per project. Grants are awarded within the annual budget (CHF 80 million in 2026), first come, first served.

What is the IDC and what changes in 2027 in Geneva?

The IDC (heat consumption index) measures a building's energy use for heating and hot water per m². Between 125 and 222 kWh/m²·yr, Geneva's regulation requires an energy audit and optimisation measures; above 222 kWh/m²·yr, an energy renovation. This mandatory-renovation threshold drops to 180 kWh/m²·yr from 2027, then to 153 kWh/m²·yr from 2031.

How much does an HPE or THPE global renovation bring in Geneva?

For a single-family home, the GEnergie 2026 scale pays CHF 390 per m² of heated area (ERA) for the HPE renovation standard and CHF 470/m² for the THPE renovation standard; for an apartment building, CHF 210 and 270/m². The subsidy remains in principle limited to 50% of the works cost. A step-by-step renovation can also qualify through the M-15 bonus. Under conditions, the OCEN's HPE/THPE certificate also opens a 20-year exemption from the supplementary property tax.

My building dates from after 2000: am I entitled to subsidies?

Insulation aid (M-01) and global-renovation aid (M-10 to M-13) are reserved for buildings whose building permit came into force before 2000. Replacing an oil, gas or fixed electric heating system with a heat pump, and solar support (Pronovo, SIG premiums), are not subject to this date condition; other conditions apply (for a heat pump, notably: building outside the structuring district-heating zones, unless a derogation is granted).

Can I renovate in stages without losing the global-renovation subsidy?

Yes. If works carried out in stages (insulation, windows, heating…) finally reach an HPE or THPE standard, the M-15 bonus tops up the subsidies already received to the corresponding HPE or THPE amount. It is claimed with the last stage.

Who issues the CECB® and the HPE/THPE certificate?

The CECB® certificate and the CECB® Plus report are drawn up by a certified CECB® expert. The HPE/THPE certificate is issued by the OCEN (CHF 200 online, CHF 300 on paper, since 1 September 2026); under conditions — notably a building permit application filed after 5 August 2010 — it opens a 20-year exemption from the supplementary property tax. We tell you from the first call which documents your project needs.

Can Abelarti handle the application for me?

Yes. We check eligibility, prepare the documents, file or accompany the application, then follow the completion paperwork through to payment. It is part of our service — talk to an advisor.

Official sources and notes
  1. Amounts and conditions: GEnergie 2026 subsidy scale, Cantonal Energy Office (OCEN), applicable from 1 February 2026 — measures M-01, M-05, M-06, M-10 to M-13 and M-15. Application received before works (≥ 14 days); subsidy in principle ≤ 50% of costs; minimum CHF 1'000.
  2. SIG premiums (solar premium 25% of the grant, installations from 2 to < 30 kWp certified by Pronovo after 1.1.2026; battery premium CHF 130/kWh capped at 15 kWh, batteries < 50 kWh): SIG announcement of 4 December 2025, effective 1 January 2026 and SIG page "Ma maison solaire". Utility premiums, distinct from cantonal subsidies.
  3. IDC thresholds: OCEN, "Un nouveau cadre pour la transition énergétique" — energy regulation in force since September 2022, timetable 2022 / 2027 / 2031 (450, 800, 650 and 550 MJ/m²·yr, i.e. 125, 222, 180 and 153 kWh/m²·yr).
  4. Supplementary property tax exemption: ge.ch — HPE/THPE certificate; fees from 1 September 2026: OCEN, 10 July 2026 (CHF 200 online, CHF 300 on paper).
  5. Financing: OCEN, 2 July 2026 — implementing regulation of the law on financing building energy renovation · ge.ch — loan or loan guarantee. No amounts are published: assessed case by case.

Other references: ge.ch — energy subsidies · GEnergie 2050 — measures catalogue · Pronovo — one-time grant.

Content verified on 30 September 2026 against the official documents above. Amounts are reference values, not promises: only the competent authorities confirm eligibility, amount and payment. Rates and budgets may change during the year.

Free quote · No obligation

Let's talk about your project

By submitting this form, you agree to be contacted by Abelarti by phone, email or WhatsApp about your request. Your data remains confidential. Privacy policy