Get a Quote

Canton of Fribourg · 2026 guide · verified on 22 July 2026

Energy subsidies in the canton of Fribourg in 2026

Fribourg applies in 2026 its scale in force since 2025: heat pumps with a hot-water supplement, insulation at CHF 50/m² with a full-envelope bonus. Solar remains federal, via Pronovo. Amounts verified against official documents.

What the Fribourg Buildings Programme pays in 20261

Air-to-water heat pump (M-05) — base, + CHF 150/kW + CHF 1'000 hot water

CHF3'500

Ground- or water-source heat pump (M-06) — base, + CHF 300/kW + CHF 1'000

CHF5'000

Envelope insulation — M-01 (bonus 60/m² for the full envelope)

CHF50/m²

Which subsidy for your project?

Solar panels fitted by Abelarti on a roof in Misery-Courtion, canton of Fribourg

Solar panels

No cantonal aid for residential solar: the federal Pronovo one-time grant applies, claimed after commissioning.

Am I eligible? →
LG THERMA V R290 Monobloc — pompe à chaleur air-eau

Heat pump

CHF 3'500 + 150/kW air-to-water, CHF 5'000 + 300/kW geothermal — plus CHF 1'000 if the heat pump also produces domestic hot water.

Am I eligible? →
Panneaux isolants swisspor en entrepôt, prêts pour la livraison

Thermal insulation

CHF 50/m² of insulated element, and CHF 60/m² if you insulate at least 90% of the facade and roof in one step.

Am I eligible? →

Solar: the Pronovo one-time grant

Canton Fribourg pays no cantonal aid for residential solar: support goes through the federal one-time grant managed by Pronovo2. For installations below 100 kWp, the application is filed after commissioning.

We size the installation, run the Pronovo file and price every aid into the quote. Discover our solar offer.

Fribourg roof with black solar panels by Abelarti, village and church spire in the background

Abelarti installation — Misery-Courtion, canton of Fribourg.

Heat pump: base + power + hot-water supplement

The Fribourg scale combines a base, the power and hot water1:

  • Air-to-water (M-05): CHF 3'500 + CHF 150 per kW, + CHF 1'000 if the heat pump also produces domestic hot water.
  • Ground- or water-source (M-06): CHF 5'000 + CHF 300 per kW, + CHF 1'000 hot water; drilling by a certified company.

Key conditions: replacement of an oil, natural-gas or fixed electric heating system; building envelope at least CECB class E; heat-pump system module up to 15 kW; power capped at 50 W/m². Fribourg particularity: works may only start once the grant decision has been received (usually 2 to 4 weeks).

See our R290 air-to-water heat pumps.

LG THERMA V R290 Monobloc — unité extérieure

LG THERMA V R290 Monobloc — official LG visual. In Fribourg the decision comes before the first dig.

Insulation: CHF 50/m², bonus 60 for the full envelope

Fribourg measure M-01 pays1:

Facade, roof, walls and floor — U ≤ 0.20 W/m²K after worksCHF 50/m²
IP-14 bonus: ≥ 90% of facade + roof surfaces insulated in one stepCHF 60/m²

Conditions: permit before 2000, U-value improved by at least 0.07 W/m²K, minimum CHF 1'000 per application, CECB Plus above CHF 10'000 of aid. And a local asset: our swisspor insulation is made in Châtel-St-Denis, in the canton. Discover our insulation solutions.

Isolants swisspor en entrepôt avec camion de livraison

swisspor insulation — official swisspor visual. Made in Châtel-St-Denis: Fribourg insulation, produced in the canton.

Batterie de stockage Sigenergy installée par Abelarti à Mont-sur-Rolle, canton de Vaud

Sigenergy battery — Abelarti installation in Mont-sur-Rolle (VD).

Your subsidy application in 4 steps

Eligibility and estimate

We identify the applicable federal, cantonal and municipal subsidies — clearly separating confirmed amounts from estimates.

Technical visit

A technician checks the building, power sizing, surfaces and the documents your application needs.

Filing at the right moment

Before works for cantonal measures, after commissioning for the Pronovo one-time federal grant.

Follow-up until payout

Invoices, certificates, completion notice: we follow the file until the money is actually paid.

Two extras worth remembering

Municipal subsidies

Several municipalities in the canton — including Fribourg, Bulle, Châtel-St-Denis, Romont — grant additional energy or renovation aid. Amounts, deadlines and budgets vary: get written confirmation from the municipality before counting this aid in your financing. We check your municipality before the quote.

Tax deductions

Energy-saving works are generally tax-deductible for private owners — but only the share you actually pay after subsidies counts. Confirm the details with the cantonal tax administration; we provide the supporting documents.

Abelarti in the canton of Fribourg

From the Broye to the Gruyère, our teams work across the whole canton — the photo on this page comes from our Misery-Courtion worksite. And our swisspor insulation is produced in Châtel-St-Denis: short circuit, from the Fribourg manufacturer to your roof.

Are your works eligible for the 2026 subsidies?

We identify the schemes that apply at your address, quantify the aid in your quote and file each application at the right moment.

Check my eligibility

Fribourg subsidies 2026: the essential answers

Does Fribourg subsidise solar panels directly?

No — residential solar support goes through the federal one-time grant, managed by Pronovo, claimed after commissioning.

Should the application be filed before or after the works?

Fribourg applies the strict rule: file before the works, and the site may only start once the grant decision has been received — allow 2 to 4 weeks. For solar, the Pronovo application is made after commissioning.

Is the CHF 1'000 hot-water supplement automatic?

It applies when the subsidised heat pump also produces the building's domestic hot water. We systematically plan for it where relevant.

Is a storage battery subsidised in Fribourg?

The cantonal catalogue has no battery measure. Some municipalities or utilities may offer one-off support: we check your municipality before the quote — see our storage solutions.

Which envelope condition applies to a subsidised heat pump?

The building must have an envelope of at least CECB class E. If not, insulating first (M-01) and then replacing the heating is often the best sequence — and the two aids are cumulative.

Can Abelarti handle the application for me?

Yes. We check eligibility, prepare the documents, file or accompany the application, then follow the completion paperwork through to payment. It is part of our service — talk to an advisor.

Official sources and notes
  1. Amounts and conditions: "The Buildings Programme in the canton of Fribourg" — official flyer of the Energy Office (scale in force since 1.1.2025, confirmed 2026) and fr.ch measure pages (updated December 2025 – June 2026). Cap: CHF 100'000 per building; works only after the decision is received.
  2. Solar: fr.ch — subsidy programmes: residential solar support is handled centrally by Pronovo.

Other references: fr.ch — thermal insulation (M-01) · fr.ch — air-to-water heat pump (M-05) · Pronovo — one-time grant.

Content verified on 22 July 2026 against the official documents above. Amounts are reference values, not promises: only the competent authorities confirm eligibility, amount and payment. Rates and budgets may change during the year.

Free quote · No obligation

Let's talk about your project

By submitting this form, you agree to be contacted by Abelarti. Your data remains confidential.